Asphalting, sidewalks and lighting second stage (Marawa)
Asphalting, sidewalks and lighting second stage (Marawa)
Project name: Asphalting, sidewalks and lighting of the second phase (Marawa)
Project No.: 19/14/01/601/08/00/4
Achievement rate: 100
Percentage of elapsed time: 100
Scheduled end: 02/21/1442
Ongoing works: Implementation of the road linking the village of Marawa and Wadi Al-Sadr, with a length of 3600 meters in length and a width of 12 meters.
Notes: The project has been received
Project contractor: Al-Hilali